Program Description
The City of Vernon's Solar Energy and Net Metering Program promotes customer adoption of residential and commercial solar photovoltaic systems.
Eligibility Criteria
- The installed system size must be less than or equal to the customer’s average peak electricity demand over the last 12-month period.
- The maximum system size installed under the Program is 1 Megawatt (MW).
- Customers with an active VPU electric account in good standing are eligible to participate in the Program.
- All components in the solar photovoltaic system must be new and unused, and have not previously been placed in service in any other location, or for any other application.
- Solar photovoltaic systems must meet all of the requirements listed in the "City of Vernon Guidelines" for interconnection of customer-owned distributed generation.
- Solar photovoltaic systems must be installed with power production meters to monitor and measure the system’s performance and the quantity of electricity generated by the system.
- The solar photovoltaic system must be located on the same premise of the end-use customer, where the customer's electric demand is located.
- The solar photovoltaic system must be connected to the City of Vernon’s electrical distribution system.
- The solar photovoltaic system must be installed in conformance with the manufacturer’s specifications and in compliance with all applicable electrical and building code standards.
Special Conditions & Program Implementation
- Customers electing to participate in the Net Metering Program will be served pursuant to the terms and conditions of the City’s Net metering service schedule No. NM.
- Customers electing to participate in the program must submit a completed application to the City, which will be processed within 30 days.