VPU Customer Service guidelines on how to upgrade your utility services.
Upgrading your electric panel requires coordinating with multiple entities, here is your guide to the process:
- Request, receive, and submit an application package
- Verify the location of the transformer and new panel or switchgear.
- Submit PDF copies of the electrical and utility plans for new buildings to the utility service planner (Required for 400A and above).
- Make corrections and resubmit, if requested.
- Submit shop drawings for switchgear (and bus duct, if applicable).
Customer Service
(323) 583-8811, ext. 269, 297 or 202
CustomerService@cityofvernon.org
Utility Service Planner, Ryan Hendrickson
ryan.h@petrellieelectric.com
(661) 607-5297
-
Request and receive detailed customer drawings from Petrelli Electric for UG construction
-
Request and receive VPU Electric Service Requirements (ESR)
-
Request and receive Easement Applicant Packet (if needed)
-
Pay the appropriate fee and pull Electrical and/or Encroachment permits
Customer Service
(323) 583-8811, ext. 269 or 297
CustomerService@cityofvernon.org -
Pay invoice to Customer Service after VPU approval
Customer Service
(323) 583-8811, ext. 269 or 297
CustomerService@cityofvernon.org -
Electrical Construction
Call for electrical inspection and make correction(s) if needed.
Customer Service
(323) 583-8811, ext. 269 or 297
CustomerService@cityofvernon.org -
Utility Infrastructure and Switchgear Construction
- Verify the location of the transformer and new panel or switchgear. Call for utility infrastructure inspection and make correction(s) if needed.
- Create the Easement document and submit it for UG/Padmount service, or upon request.
Electric Service Requests
ElectricalService@cityofvernon.org -
Petrelli Electric Construction (if needed)
- XFMR installation
- Primary and secondary installation
- Pole relocation and replacement
Utility Service Planner, Ryan Hendrickson
(661) 607-5397
CustomerService@cityofvernon.org
- Install meter
-
After the “On Order” is issued, the property will be energized